
Met Council NAI Phase 6
We worked to help rehabilitate the existing interceptor with Insituform by installing temp conveyance, tunneling and rehabilitating manholes and meter structures
Minger Construction Companies, Inc.
Specializing in open cut utility construction
We worked to help rehabilitate the existing interceptor with Insituform by installing temp conveyance, tunneling and rehabilitating manholes and meter structures
The Michel Corporation needed temporary conveyance installed in the city of Minneapolis.
As a part of the Hennepin County TH 101 Reconstruction, we installed dual forcemains.
This extensive project involved dual forcemains ranging in sizes from 18 inches to 24 inches.
This was an area-wide project encompassing the entire Twin Cities area. We rehabilitated over 50 manholes across the cities.
Seneca Phase 3 was an area-wide project to rehabilitate various structures. The project involved rehabilitating over 30 structures.
There were several lift stations throughout the city of Minneapolis that needed repair. We rehabilitated nine lift stations in total across the city.