Met Council NAI Phase 6

Project Owner

Metropolitan Council

Project Year

2016

Location

Coon Rapids, MN

We worked as a subcontractor for Insituform in Coon Rapids, MN to help rehabilitate the existing sanitary sewer interceptor.  The project consisted of MH rehabilitation, new forcemain installation, tunneling and installing 4 separate temporary conveyance systems.  The 72″ diameter steel casing tunnel for a new gravity sewer consisted of 200 LF in length and working closely with CenterPoint Energy to tunnel under two high pressure gas mains that were pressurized over 500 psi!