Met Council NAI Phase 6

03.19.17 by development

We worked to help rehabilitate the existing interceptor with Insituform by installing temp conveyance, tunneling and rehabilitating manholes and meter structures

Filed Under: MANHOLE REHABILITATION, Our Projects, TEMPORARY CONVEYANCE, TUNNELING PROJECTS Tagged With: interceptor, temporary conveyance, tunneling, tunneling boring machine

I-MN-341 Interceptor

06.09.16 by Jena Felsheim

The Michel Corporation needed temporary conveyance installed in the city of Minneapolis.

Filed Under: MANHOLE REHABILITATION, Our Projects, TEMPORARY CONVEYANCE Tagged With: interceptor, temporary conveyance

Wayzata TH 101 Forcemain

06.09.16 by Jena Felsheim

As a part of the Hennepin County TH 101 Reconstruction, we installed dual forcemains.

Filed Under: Our Projects, SITE UTILITIES, TEMPORARY CONVEYANCE Tagged With: force main, force main installation, site utilities, temporary conveyance

Met Council HSI Contract F Forcemain

06.09.16 by Jena Felsheim

This extensive project involved dual forcemains ranging in sizes from 18 inches to 24 inches.

Filed Under: MANHOLE REHABILITATION, Our Projects, SITE UTILITIES, TEMPORARY CONVEYANCE Tagged With: force main, force main installation, site utilities, street reconstruction, temporary conveyance

Cedar Rapids East Side Interceptor Rehab

06.09.16 by Jena Felsheim

We rehabilitated manholes throughout the east side of the city of Cedar Rapids.

Filed Under: MANHOLE REHABILITATION, Our Projects Tagged With: cedar rapids, concrete, interceptor, manhole rehabilitation, temporary conveyance

Trenchless Phase 3

06.09.16 by Jena Felsheim

This was an area-wide project encompassing the entire Twin Cities area. We rehabilitated over 50 manholes across the cities.

Filed Under: MANHOLE REHABILITATION, Our Projects, TEMPORARY CONVEYANCE Tagged With: fiberglass, manhole rehabilitation, polymer, temporary conveyance

Seneca Phase 2

06.09.16 by Jena Felsheim

Seneca Phase 3 was an area-wide project to rehabilitate various structures. The project involved rehabilitating over 30 structures.

Filed Under: MANHOLE REHABILITATION, Our Projects, SITE UTILITIES, TEMPORARY CONVEYANCE, TUNNELING PROJECTS Tagged With: fiberglass, manhole rehabilitation, repair, seneca, temporary conveyance

Minneapolis Sanitary Sewer Lift Station Rehab

06.09.16 by Jena Felsheim

There were several lift stations throughout the city of Minneapolis that needed repair. We rehabilitated nine lift stations in total across the city.

Filed Under: LIFT STATIONS, Our Projects, TEMPORARY CONVEYANCE Tagged With: lift station, minneapolis, temporary conveyance

Contact Info

Minger Construction Co., Inc.
620 Corporate Drive
Jordan, Minnesota 55352
952.368.9200 office 952.368.9311 fax info@mingerconst.com
An Equal Opportunity Employer

Connect With Us

  • Facebook
  • Twitter

LOCATION

Copyright © 2023 · Minger Theme on Genesis Framework · WordPress · Log in