We worked to help rehabilitate the existing interceptor with Insituform by installing temp conveyance, tunneling and rehabilitating manholes and meter structures
Utah DOT I-15 Expansion
The Utah Department of Transportation required tunnels. Using TBM and GBM tunneling methods, we completed 78 tunnels ranging from 15 inches to 96 inches in diameter.