Project Type: Site Utilities
Project Owner: Metropolitan Council, MN
Project Completed: 2016
As a part of the Hennepin County TH 101 Reconstruction, we installed dual force mains. To install the force main, we directional drilled a 24 inch HDPE pipe under Gray’s Bay on Lake Minnetonka. While the rest of the forcemain was installed using open cut methods thru very marginal soils.
We also installed 5,000 LF of 20 inch HDPE pipe to set up a temporary conveyance system during the project to keep the existing system running while the new pipe was installed.